Initial Investigation
on the Libmanan-Cabusao Dam Project  in Sipocot


As a result of the concerns raised by the residents of Lupi regarding the construction of the Libmanan-Cabusao Dam, the Institute for Environmental Conservation and Research (INECAR) responded by conducting an initial investigation. The objectives of this initial study are:

To know the current status of the dam being built in Sipocot
To assess the approved Environmental Impact Statement (EIS) of NIA 
To find out the sentiments and fear of the people of Lupi regarding the dam project
To propose possible alternatives for sourcing water for Libmanan and Cabusao

The downloadable files listed below contains critical data regarding the issue.

-
The Title Page
-
Initial investigation Sipocot Dam
-
Appendix A1- View of the DAM Site Construction as of Oct. 17, 2009
-
Appendix A - Environmental Compliance Certificate
-
Appendix B Lupi-Sipocot Points
-
Appendix C River Connection
-
Appendix D Gen. Layout of Dam
-
Appendix E plastic
-
Appendix F Flood Hazard Map
-
Appendix G Sediments
-
Appendix H Signature Campaign
-
Appendix I Old Church Ruins